Case Studies Home > Lostock 132kV Contestable Connection
Excalon have recently completed the installation of a quadruple 132kV circuit between a newly built GIS for Lostock Sustainable Energy Plant to two newly built Towers & an existing SPEN Circuit.
The route encompassed a number of SED’s, including a section of HDD underneath the Trent & Mersey Canal, passing under a network rail bridge and crossing a number of gas, oil and water pipelines, requiring substantial temporary works and protection measures.
This necessitated liasing with a number of landowners and stakeholders, as well as working in close proximity to a large number of external contractors who were engaged elsewhere on the site to build and commission the plant.
The duct installation was completed by Excalon’s civil team, often using temporary works due to the depth of the excavation.
Each of the four circuits were installed by our Cable team using our cable trailer & cable pushing caterpillars.
Excalon’s cable jointers completed the 11kV jointing work & the 132kV terminations inside the GIS & on both new Towers. Due to the circuit not being made live until mid-2024 we have also installed two sacrificial terms near the existing SPEN circuits to allow for the completion of the required HVAC testing prior to handover.
Excalon’s EHV Division’s primary contract and delivery responsibilities are to:
Client: Omexom
Duration: 33 Months
Services Provided: