Excalon was appointed by Iberdrola Engineering and Construction to manage and install new 132kV 10 way ducted system for cable tails within Maentwrog hydro-electric power station.
The overall purpose of the scheme is to reinforce the 33kV network between Trawsfynydd GSP and Maentwrog GSP. The works fall within the boundary of Snowdonia National Park and were subject to strict governance in all areas relating to the environment.
The project has been delivered within a tight timescale with the works constructed within a high voltage grid substation within Maentwrog powerstation, and within the vicinity of transmission overhead lines and buried services. A key aspect was the interaction between the cable installation contractor and overhead lines tower contractor to allow sequential segregation of tasks to meet the shutdown deadline.
The works involved:
• Laying approximately 110m of duct between the substation and the tower base with a substantial height difference of approximately 80ft.
• Core drilling through 450mm reinforced concrete retaining wall to allow insertion of 6 no. 160mm ducts and 2 no. 110mm ducts, including injection grouting.
• Fabrication of 7 no steel power cable structures for supporting 132kV cable cores above ground from retaining wall to cable sealing ends.
• Design and installation of solar shields.
This required a full temporary works design for the extensive deep excavation and shoring down the steep embankment and the retaining wall.
Download Case Study – 132kV Maentwrog
Client: Iberdrola
Duration: 6 Months
Services Provided:
If you would like a member of our team to give you a call, just enter you name and telephone number and we will call you as soon as we can.